Projects

Cedars Park School, Stowmarket

We designed all mechanical and electrical engineering services including advice on renewable energy concepts to be adopted at this new school for Suffolk County […]

Tilbury Enterprise Centre

We were engaged as mechanical and electrical design consultants to undertake full design of the services, with an emphasis on low energy engineering. The […]

King’s School, Canterbury

Following a detailed site energy review, we were appointed to carry out the design and project management of mechanical and electrical engineering systems for […]

Thames Chase Visitor Centre

We assissted in the design of an Eastern Region RIBA award winning sustainable carbon neutral project. The use of biomass was employed to provide […]

Wat Tyler Country Park Visitor Centre

We carried out the mechanical and electrical design for the conversion of an existing weapons factory into a Heritage Information Centre. The scheme included […]

Stanwick Lakes Visitor Centre

The building was designed to be carbon neutral in operation and to have a low environmental footprint that will educate visitors to the country […]

The Sixth Form College Colchester

We were commissioned to design a low energy building to provide the college with 33 teaching spaces, a lecture theatre, sports hall and all […]

London Southend Airport Terminal Extension

The Energy Practice Ltd was engaged to undertake the electrical design of the Southern Airport Terminal Extension.

Described by Secretary of State for Transport, The […]

DONG Energy West of Duddon Sands

Complete mechanical and electrical design, as well as Part L compliance.

Colchester Garrison Personnel Recovery Centre

Complete mechanical and electrical design, as well as Part L compliance.